SPONSORED BY: Leland Industries
AWARDED TO: HFH Inc.
DESIGNED BY: HFH Inc.
ENGINEERED BY: DesignLogix Engineering
CFBA MEMBER SUPPLIERS:
Canarm
Agway Metals
Marspan Home Hardware
HIGHLIGHTS:
Farm Shop & Office
6 bay shop with large office & mezzanine
5,160 building with 19’ ceilings shop with a 400 square foot office & a large 3 pc bathroom, staff break area & large 1,200 sq. ft. 2nd level mezzanine
The 6-bay shop (3 double bays) includes ample space to work on equipment year-round, with 4 various-sized poly doors that let in additional daylight
A custom-made heavy-duty retractable curtain allows for one bay to be closed off for painting, cleaning or welding as needed & be separated from the rest of the space
Radiant floor heat runs off of a CleanBurn boiler which produces heat from used motor oil in a clean & efficient manner
The Boiler includes a collection system & a large indoor storage tank, positioned directly under the boiler up on the mezzanine
LED lighting throughout as well as speakers, cameras, and Starlink internet
R50 insulation in the attic and R22 Roxul batt insulation in the walls
Large office allows for 3-4 employees with under-stairs storage for IT equipment & misc. office storage
Bathroom includes a urinal, toilet, large vanity, and then under the mezzanine a kitchenette lunchroom, with utility sink & eye wash station nearby
Wrap around timber frame front entrance area with mortise and tenon connections, stained wood ceiling and full bed stone accents